Brendon's RV-10

Jan 22 2023

Right Elevator 9-11 Steps 2-6

Back riveted the right elevator ribs to the skins, the rear spar to the aft flanges of the rib halves, the shear clipbs and the elevator gussets

Previous post:
Jan 21 2023 Jan 21 2023

This post is from Brendon's RV-10

Next post:
Jan 26 2023 Jan 26 2023