Brendon's RV-10

Mar 1 2023

Elevator 9-10 Steps 4-7 9-11 Steps 1-3

Back riveted the rib halves to the skins, as well as the forward spar, inboard rib, and elevator horn together. Riveted the nutplates to the trim doubler plate

Previous post:
Feb 27 2023 Feb 27 2023

This post is from Brendon's RV-10

Next post:
Mar 13 2023 Mar 13 2023