Brendon's RV-10

Apr 1 2023

9-13 Step 3, 9-14 Steps 1-6, 9-15 Steps 3-6

Had Lindy over today to squeeze a few rivets and sign her name! match drilled the piano hinges for both elevators and rolled the leading edge for the left elevator

Previous post:
Mar 31 2023 Mar 31 2023

This post is from Brendon's RV-10

Next post:
Apr 14 2023 Apr 14 2023