Brendon's RV-10

Apr 15 2023

9-17 Steps 2-8

Continued on with the one good trim tab while we waited for the replacement to arrive. Clecoed the spar in the elevator trim tab skin and match drilled the holes in the spar as well as the bent tabs. Countersunk the forward holes in the top of the spar.

Previous post:
Apr 14 2023 Apr 14 2023

This post is from Brendon's RV-10

Next post:
Apr 16 2023 Apr 16 2023