Brendon's RV-10

Apr 17 2023

Horizontal Stabilizer 8-7 Steps 1-5, 8-8 Steps 1-8, 8-9 Steps 1, 5

Pops got the HS cradles made while I was at work as well as deburring the inspar and tip ribs. Got the frame put together when i got home from work and started the match drilling in the skeleton as well as the skins for the tip ribs.

Previous post:
Apr 16 2023 Apr 16 2023

This post is from Brendon's RV-10

Next post:
Apr 18 2023 Apr 18 2023