Brendon's RV-10

May 28 2023

Wings 13-2 Steps 5-7

Marked and trimmed the j-stiffeners. Did find out that it is necessary to remove the blue vinyl so that the two overlapping portions of the j channels sit flush! Match drilled the 164 holes between the top flange of the left wing and the j channels. Still have to do the other flange and other spar. Wow this is a lot of match drilling

Previous post:
May 27 2023 May 27 2023

This post is from Brendon's RV-10

Next post:
May 29 2023 May 29 2023