May 28 2023
Wings 13-2 Steps 5-7
Marked and trimmed the j-stiffeners. Did find out that it is necessary to remove the blue vinyl so that the two overlapping portions of the j channels sit flush! Match drilled the 164 holes between the top flange of the left wing and the j channels. Still have to do the other flange and other spar. Wow this is a lot of match drilling