Brendon's RV-10

Jun 4 2023

Wings 13-3 Steps 4-9, 13-4 Steps 1-11, 13-5 step 1

Closed out Section 13 today! Had to complete the rest of the countersinking in the main spar and then rivet the remaining nutplates on. Also fabricated the tie down brackets, match drilled and assembled them on to the spars.

Previous post:
Jun 3 2023 Jun 3 2023

This post is from Brendon's RV-10

Next post:
Jun 9 2023 Jun 9 2023