Brendon's RV-10

Fuse Sept 8 2024

Fuse Section 29

Started work on Section 29! Cut the longerons to length and started to bend them based on the template. Riveted several remaining items on the bottom skin as well as temp installed the brake reservoir on the firewall

Previous post:
Fuse Sept 1 2024 Fuse Sept 1 2024

This post is from Brendon's RV-10

Next post:
Fuse Sept 29 2024 Fuse Sept 29 2024