Fuse Oct 11 2024
Fuse Section 29-4/5
Started working on rolling the side skins where the skin rolls from the side to underneath the aircraft. Only did the back left panel this evening. Had some difficulties with getting the clamps to hold and trying not to crinkle the skin. The curve didn't turn out great, but when the F-1034C Fuselage bulkhead is installed, pulls the skin into the correct curve. Used an angle iron instead of the hardwood that's called out in the instructions, per Austin Manke's videos.