Brendon's RV-10

Fuse Nov 16 2024

Fuse Section 29-16

Completed 29-16 for the left side. Still need to prep and prime the right side parts. Longerons riveted to the rear seat brace and side ribs. Longerons riveted to Gussets. Riveted the upper and lower firewall channels to the firewall brackets, except for the forward most rivets. Have a solution that i'm working on for those that i'll tackle in the next week or so. Rachel helped rivet the double rivet line where the forward and mid fuse skins line up.

Previous post:
Fuse Nov 15 2024 Fuse Nov 15 2024

This post is from Brendon's RV-10

Next post:
Fuse Nov 17 2024 Fuse Nov 17 2024