Brendon's RV-10

Fuse Dec 6 2024

Fuse Section 29

Completed riveting the side skins for what i could reach solo. Still need to rivet the side to bottom skin joint, but need Rachel's help to complete. Realized that i didn't firewall epoxy the side skins to the firewall, so added beads of that high temp epoxy at the gaps between the tabs on the firewall and a bead on the inside of the joint between the firewall and side skins to help seal. Will end up getting painted so shouldn't be able to notice it unless looking for it. Fixed the few incorrect stack-ups on the left landing gear bolts and completed the last 3 bolts that needed to be torqued on that assembly. Rough fit the scat tube through the tunnel to see how it's going to fit in the tunnel. Shouldn't get in the way with the fuel mixing valve with the extension.

Previous post:
Fuse Dec 5 2024

This post is from Brendon's RV-10

Next post:
Fuse Dec 7 2024 Fuse Dec 7 2024