Brendon's RV-10

Fuse Feb 15 2025

Fwd Fuse Paint, Brake Controls, and Control Sticks

Sprayed the forward floor pans using the matte black hammered black rattle can paint

Completed the forward rivets in the pilot/co-pilot floor pans using a wedge of delrin with a hole through it to allow for the pop rivets to sit flush. Didn't have any excess pieces of trailing wedge to utilize so had to get creative.

Installed the fittings on the brake master cylinders and installed to the rudder pedal assemblies.

Installed the hardware on the F-1089 and F-1090 torque tubes to the elevator idler arm assembly

Cut the length of the control sticks to reduce the length of the bottom of the arm.

Previous post:
Fuse Feb 2 2025 Fuse Feb 2 2025

This post is from Brendon's RV-10

Next post:
Fuse Feb 16 2025 Fuse Feb 16 2025