Brendon's RV-10

Fuse Feb 19 2025

Rear Floor Pan riveting and paint, Fuel Return lines

Finished riveting the side sections of the rear seat floor pans. What a pain in the ass. Luckily the side deck parts are not yet rivet in which made access much easier.

Drilled the side access holes for the fuel return lines in the fuselage per the Aircraft flightline specialty flightlines instructions.

Sprayed the rear seat floor pans with the same paint as the front floor pans.

Previous post:
Fuse Feb 18 2025 Fuse Feb 18 2025

This post is from Brendon's RV-10

Next post:
Fuse Feb 20 2025 Fuse Feb 20 2025