Brendon's RV-10

Elevators Mar 26 2026

Nearly Completed Elevators

Completed majority of the riveting of both elevators including the hard to reach rivets at each end. Was able to squeeze the rivets along the main spar and the end ribs. Was also able to complete both trim tabs (for the 4th time) without and hiccups! Pro sealed in the trailing edge foam pieces, as well as the trailing edge wedge. Left to dry overnight and will come back in a few days when the sealant is dry to complete the trim match drilling to the piano hinge, as well as riveting the trailing edge wedge, and curling and riveting the leading edge.

Previous post:
Elevators Mar 25 2026 Elevators Mar 25 2026

This post is from Brendon's RV-10