Brendon's RV-10

Firewall Forward May 9 2026

Cutting holes and mounting hardware onto firewall

Cut the two holes for the EFII wiring harness passthrough. Drilled the 4x holes and mounted nutplates for the 2x MAP sensors that will eventually have vacuum hoses running to them. Need to get the engine hung before i can run those though. Also trying to figure out placement for the anti-splat oil separator.

Previous post:
Oil Cooler May 4 2026 Oil Cooler May 4 2026

This post is from Brendon's RV-10

Next post:
Doors May 9 2026 Doors May 9 2026