Firewall Forward May 9 2026
Cutting holes and mounting hardware onto firewall
Cut the two holes for the EFII wiring harness passthrough. Drilled the 4x holes and mounted nutplates for the 2x MAP sensors that will eventually have vacuum hoses running to them. Need to get the engine hung before i can run those though. Also trying to figure out placement for the anti-splat oil separator.