David's RV-14

Entry: Wed Nov 15 2023

07-04 - 07-09

Experienced significant difficulty with 07-05, step 3. Specifically, the rivets were too long and folding over. After consulting with a fellow builder, I decided to use AN426AD4-7s instead of -8s. Also used the manual rivet squeezer which allowed me to get into the tight areas of the lower rudder spar. Concluded today by final drilling the skins.

Previous post:
Entry: Wed Nov 08 2023

This post is from David's RV-14