Entry: Wed Nov 15 2023
07-04 - 07-09
Experienced significant difficulty with 07-05, step 3. Specifically, the rivets were too long and folding over. After consulting with a fellow builder, I decided to use AN426AD4-7s instead of -8s. Also used the manual rivet squeezer which allowed me to get into the tight areas of the lower rudder spar. Concluded today by final drilling the skins.
Previous post:
Entry: Wed Nov 08 2023
Entry: Wed Nov 08 2023
This post is from David's RV-14