David's RV-14

Entry: Fri Dec 01 2023

Rudder complete

Completed 07-10 - 07-12, this finishing the rudder build. The only real difficulty was mistakingly grabbing the smaller of the two weights and match drilling for the counterweight. After consulting with Vans it was decided to flatten the dimpled, mistaken hole and match drilling to the correct counterweight.

Looking forward to perfecting the priming of future parts.

Previous post:
Entry: Wed Nov 15 2023 Entry: Wed Nov 15 2023

This post is from David's RV-14