12 Nov 2022
VOR Antenna and priming
Drilled a small hole in the VOR antenna base to accommodate rivet. Upsized diameter to 9.0mm and deburred. To be rechecked when rivets are returned.
Enlarged vertical stabiliser rear spar Rivne’s pass through holes from 4.5mm to 4.8mm to improve clearance for M4 screws.
Re-primed the horizontal stabiliser spar channel, elevator counterweight bracket and elevator bracket. Primed vertical stabiliser, rudder, horizontal stabiliser and elevator skins.