Installed standoffs and reassembled elevator control arm

Riveted two standoffs in the vertical stabiliser - I decided to add one extra in the region of the elevator control arm counterweight to ensure the beacon wiring is held firmly out of the way of the moving arm. Riveted the elevator control arm left bracket in place again, except for two stainless steel rivets which are still outstanding. Completed riveting the rest of the control arm since the balance of the missing rivets have been supplied now.