Gary's Sling TSi

20 Apr 2023

Installed rivnuts in light brackets

Installed 8x rivnuts in each of the left and right landing light channels. Applied Loctit 277

Previous post:
18 Apr 2023

This post is from Gary's Sling TSi

Next post:
22 Apr 2023 22 Apr 2023