Gary's Sling TSi

22 Apr 2023

Preparing main wing top skins and assembly of left wing starts

Deburred, dimpled and scuffed left and right wing main top skins, had a bit of help with the dimpling

Started assembly of left wing skeleton. Riveted in place ribs 1-13, installed 1x AN3 bolt and torqued to 2.7nm then applied torque seal. Require channel 18 and 993 rivets from Sling for rib 1 before installing those AN3 bolts

Dimpled Aileron and flaps as per KAI

Installed pitot tube mounting brackets

Previous post:
20 Apr 2023 20 Apr 2023

This post is from Gary's Sling TSi

Next post:
23 Apr 2023 23 Apr 2023