Gary's Sling TSi

16 Dec 2023

Fuselage join and rudder pedal bushings

Joined front and rear fuselage halves together.

Adjusted rudder pedal bushings by sanding to fit. Painstaking and time consuming exercise.

Adjusted ribs to suit rear short elevator torque tube. Used de-burring tool to remove small sections of material for bushings to seat properly. To finalise once the front side skins are installed.

Previous post:
1 Dec 2023 1 Dec 2023

This post is from Gary's Sling TSi

Next post:
18 Dec 2023 18 Dec 2023