Gary's Sling TSi

29 Dec 2023

Riveted front to rear join on fuselage sides

Riveted most of the side rivets at the front to rear fuselage joint. Will need to turn the fuselage on its side to get to the lower areas.

Torqued the brake master cylinder nuts at the lower tray area and pedals. Torque the pilot's left pedal to rudder assembly bolt - the other three need to be replaced by Sling, they are way too long.

Previous post:
28 Dec 2023 28 Dec 2023

This post is from Gary's Sling TSi

Next post:
31 Dec 2023 31 Dec 2023