3 Jan 2024
Fiddling with magentometer and rear fuselage fittings
Installed earth lug for magnetometer, applied low strength Loctite. Decided against safety wiring the DB9 pins due to lack of accessibility once the fuselage is closed, used low strength Loctite there too. Applied edge protector in various relevant areas where the magnetometer and antennae cables are close to the rear fuselage structure.
Removed the pitot static lines from the pitot ports and Y connector, covered them with PET protective sleeving and then reinstalled them. Re-routed the VOR antenna cable.
Cable tied harnesses and antennae cables in place and trimmed with nail clippers.