Bearhawk 4 Place Plans #1582

Entry: Tue Aug 04 2020

Completed edge flanging for right flanged .025 back ribs and flap ribs.

Should wrap up with the aileron ribs tomorrow. From there need to process the rough tip ribs since they will need to be flanged before on the form block before the radius is adjusted to 1/8" for the .032 ribs.

Previous post:
Entry: Mon Aug 03 2020 Entry: Mon Aug 03 2020

This post is from Bearhawk 4 Place Plans #1582