Build times: ICP Savannah S

Mark's Savannah S

Total Build Time
98.3 hours

Avionics

Build time: -

not started
0%

Firewall forward

Build time: -

not started
0%

Engine

Build time: -

not started
0%

Fuselage

Build time: 9 hours

not started
0%

Miscellaneous

Build time: -

not started
0%

Electrical

Build time: -

not started
0%

Painting

Build time: -

not started
0%

Upholstery

Build time: -

not started
0%

Tail

Build time: 32.3 hours

not started
0%

Elevator

Build time: 11.5 hours

not started
0%

Horizontal stabilizer

Build time: 12 hours

not started
0%

Rudder

Build time: 7 hours

not started
0%

Vertical stabilizer

Build time: 1.8 hours

not started
0%

Wings

Build time: 52 hours

not started
0%

Ailerons

Build time: 11 hours

not started
0%

Flaps

Build time: -

not started
0%

Main wing

Build time: 41 hours

not started
0%

Spar

Build time: -

not started
0%

Section build times

Section Status Time
(hrs)
Progress
Avionics not started - -
Firewall forward not started - -
Engine not started - -
Fuselage not started 9 -
Miscellaneous not started - -
Electrical not started - -
Painting not started - -
Upholstery not started - -
Tail not started 32.3 -
Elevator not started 11.5 -
Horizontal stabilizer not started 12 -
Rudder not started 7 -
Vertical stabilizer not started 1.8 -
Wings not started 52 -
Ailerons not started 11 -
Flaps not started - -
Main wing not started 41 -
Spar not started - -
* If a parent section's time is greater than the sum of its sub-sections, it simply means one or more posts weren't categorized under a sub-section.

Build times by tag

Tag Build time (hrs)
Wing 41
Fuselage 5
Control assembly 5
Horizontal Stabilizer and Elevator 20
Vertical Stabilizer and Rudder 8.8
Trim tab 3.5
Wings 11

Build times by week