Neville's Bearhawk

Main Landing Gear

Undercarriage

Tightened adel clamp AN3 bolts that hold the hydraulic lines on both gear legs. Also tightened the bulkhead fitting, and the AN hydraulic line connection to the bulkhead fitting.

Wheels

Dismantled both wheels and added the Grove spacer ring to give clearance between the calipers and tires. Clearance is now perfect. Grove supplied longer bolts which I fitted and torqued. Still waiting for AN 45 degree elbows for the brake calipers.

Covering Preparation

I calibrated my covering iron and cut some heavy polyfiber ready for covering. Added adrasion tape to the undercarriage in preparation. Will cover both legs tomorrow.

Previous post:
Control Split Pins Control Split Pins

This post is from Neville's Bearhawk