Neville's Bearhawk

Aileron, Flap

I continued working on the aileron and flap today. This morning I covered the aileron, then used the iron to shrink the covering on both the aileron and flap. I did repeated passes up to 350°f. Next, I added the adhesive backed tapes ready for rib stitching.

Tomorrow I'll do the rib stitching, then add tapes over the top.

Previous post:
Right Flap and Wingtip Right Flap and Wingtip

This post is from Neville's Bearhawk

Next post:
Rib stitching