Aircraft Assembly
Another big day. I purchased a lot of supplies then put in a full day at the hangar. Many things were accomplished.
I reinstalled two fairleads, connected more fuel lines, reinstalled the headset jacks, reinstalled the left fuel tank, added the correct nuts snd washers to the empennage and torqued them. Also added the tail trim strip to the right side.
Also removed both wing struts and added the tie down loops, added washers, and reassembled.
Then I made some fuselage to wing trim strips for the left side and both wing to window fairings. Tomorrow I'll make the last two and paint them.
I connected the landing light and tested it. I installed the tank drains. Also added washers and nuts to the wing bolts.
This post is from Neville's Bearhawk