Scott's RV-14 Build

Dimpling Elevator Skins

I started the long process of dimpling all 4 elevator skins. My bride helped hold the E-913 skins so I could use my C-frame to dimple them as well. I prefer the C-frame dimple quality vs the squeezer. I also received the 3.5 ounce package of tank sealant I ordered from Van's last week which will be required later in the elevator construction process.

This post is from Scott's RV-14 Build