Left Elevator Continued
Big day in the shop. Finished riveting the rear spar to the upper skin, primed both skins interior fay surfaces, also primed the trim access reinforcement doubler and installed it in the lower skin along with 2 more nutplates, back riveted the E-1008 ribs to the inside of both skins and clecoed it all together for riveting.
This post is from Scott's RV-14 Build