Scott's RV-14 Build

Rear Bulkhead And Tailwheel Support Installed

Got the rear bulkhead, lower aft skin and tailwheel support done and clecoed in permanently. The bulkhead is already riveted to the lower skin. I was a surprised at how little is holding the tailwheel support to the structure. Just two AN426-4 rivets in the rear and two AN-3 bolts up front. That's it. I'd have thought it would be more tied in to the structure then that considering landing loads are going through it. I know the engineering and load analysis is there. It just isn't obvious to me. Guess I'd better make all my landings good ones! I ran out of 3/32" clecos on the fuselage but fortunately my buddy Dan has his new RV-14 at the paint shop and was happy to sell me 100 of his clecos. He'll be doing final assembly soon and I'm hoping to assist him with that.

This post is from Scott's RV-14 Build