Elevator Bellcrank
Finished up the last of the 4 pushrod assemblies uneventfully. This was the longest one. The rod end bearing measurement needs to be 72 29/32" center to center. I'll need help adjusting all the pushrod end bearings to spec next week. From there I jumped ahead a little to fabricate more parts. Next up was the elevator bellcrank assembly. As usual most of the time was spent deburring, prepping the surface and priming. The riveting went quick and easy. Wish it was always that way. Now back to my day job for a few days. Hopefully back in the shop Saturday.

Last pushrod and the longest.

Finished bellcrank ready to install.

Rough parts for elevator bellcrank.

Super easy riveting. Clamp it in the vice and hit them all with the squeezer.
This post is from Scott's RV-14 Build