Build times: Van's RV-10

Sumit's RV-10

Total Build Time
825.5 hours

Avionics

Build time: -

in progress
0%

Firewall forward

Build time: 238.5 hours

in progress
0%

Engine

Build time: 41 hours

in progress
0%

Fuselage

Build time: 396 hours

in progress
75%

Miscellaneous

Build time: 152 hours

in progress
0%

Canopy

Build time: 152 hours

in progress
0%

Electrical

Build time: -

not started
0%

Painting

Build time: -

not started
0%

Upholstery

Build time: -

not started
0%

Tail

Build time: 10 hours

in progress
0%

Elevator

Build time: -

not started
0%

Horizontal stabilizer

Build time: -

in progress
0%

Rudder

Build time: -

not started
0%

Vertical stabilizer

Build time: -

not started
0%

Wings

Build time: 29 hours

not started
0%

Ailerons

Build time: -

not started
0%

Flaps

Build time: -

not started
0%

Main wing

Build time: 26 hours

not started
0%

Section build times

Section Status Time
(hrs)
Progress
Avionics in progress - -
Firewall forward in progress 238.5 -
Engine in progress 41 -
Fuselage in progress 396
75%
Miscellaneous in progress 152 -
Canopy in progress 152 -
Electrical not started - -
Painting not started - -
Upholstery not started - -
Tail in progress 10 -
Elevator not started - -
Horizontal stabilizer in progress - -
Rudder not started - -
Vertical stabilizer not started - -
Wings not started 29 -
Ailerons not started - -
Flaps not started - -
Main wing not started 26 -
* If a parent section's time is greater than the sum of its sub-sections, it simply means one or more posts weren't categorized under a sub-section.

Build times by tag

Tag Build time (hrs)
Wing 26
Fuselage 10.5
engine 14
canopy 16.5
Research 58
Doors 18
Seats 8
Windscreen and Canopy 16
Window 6.5
windows 3
Central brace 6
back seats 8
MD-RA 3
Shipping 58
Riveting 12
Tailcone 10
Door handle assembly 58
Door latch assembly 31
Door strut 26
door 16
Front landing gear 13
Engine mount 13
practicing 8
fiberglass repair 4
bond fix 4
preparation 13
autopilot actuator install 13
door fiberglass fix 4
Wing damage fix 5
BRS Parachute 141
BRS 34
Engine systems 5
cowling 154.5
Air box 9
fuel line fittings 5
fuel injectors 5
fuel lines 4
oil lines 4
Camlocks 86
Door assembly 7

Build times by week