Sumit's RV-10

28 APR 2022 - Window trim, Central brace

Window trim, Central brace

Finishing with window trim and fit. All went well.

Roof central brace connection - sleeve insert. All went well

Riveting F-1042F gussets to the FWD F-1042L + R side channels. All went well

After, I was deburring the wings & fuselage, preparing everything for the MD-RA Inspection

This post is from Sumit's RV-10

Next post:
30 APR 2022 - MD-RA