28 APR 2022 - Window trim, Central brace
Window trim, Central brace
Finishing with window trim and fit. All went well.
Roof central brace connection - sleeve insert. All went well
Riveting F-1042F gussets to the FWD F-1042L + R side channels. All went well
After, I was deburring the wings & fuselage, preparing everything for the MD-RA Inspection
This post is from Sumit's RV-10
Next post:
30 APR 2022 - MD-RA
30 APR 2022 - MD-RA