Sumit's RV-10

Fairings, Cowling, Vent, and Bonding Surface Preparation

Prepared wheel brackets for installation of nose wheel fairings and marked nutplate locations on main wheel fairing brackets. Prepared aircraft vents for installation and continued preparation of cowl oil door for bonding. Fit top cowling with Skybolts and air deflectors, then prepared it for bonding. Sanded window frame and windshield surfaces in preparation for fiberglass bonding work.

This post is from Sumit's RV-10