RV-10 Empennage and Preparation Work (Guy – Apr 13–17)
Guy assisted with installation and positioning of horizontal stabilizer bolts. Supported fitting and adjustment of stabilizer tips and elevator hinge alignment to achieve proper bellcrank setup. Conducted parts research for Summit and elevator pushrod components. Completed preparation work for paint including tip fairings, empennage panels, stabilizer tips, and gear fairings.
This post is from Sumit's RV-10