Carl's 4-Place Bearhawk

5-7-2021

Engine Cowling - Pt 23

n area large enough for the duct to slip through from the inside. After final trimming and cleaning, I bonded the tube into the duct using Loctite EA 9396 and clamped until cured.

After cure, I riveted the NACA duct onto the lower engine cowling. I used sealant between the NACA duct and the cowling to prevent any potential chafing and to help seal the gap between the two components.

Previous post:
4-27-2021 4-27-2021

This post is from Carl's 4-Place Bearhawk

Next post:
5-20-2021 5-20-2021