Brendon's RV-10

Feb 5 2023

Right Elevator 9-15 Steps 3-6

Rolled the leading edge of the elevator, match drilled, deburred, and riveted together.

Previous post:
Jan 29 2023 Jan 29 2023

This post is from Brendon's RV-10

Next post:
Feb 5 2023