Brendon's RV-10

Apr 29 2023

Tailcone 10-11 Steps 3-5, 10-12 Steps 1-5, 7

Match drilled the holes in the side skins and bottom skins to the flanges of the bulkheads. Match drilled the holes between the tailcone top skins and the stiffeners and bulkheads. Also match drilled the holes for the yaw damper braket into the F-1007 Frame. Also took the opportunity to rest the horizontal stabilizer on the aft deck to see what two parts mated together look like!

Previous post:
Apr 28 2023 Apr 28 2023

This post is from Brendon's RV-10

Next post:
Apr 30 2023 Apr 30 2023