Apr 30 2023
Tailcone 10-12 Steps 6, 8-9, 10-13 Steps 3-6
Match drilled the holes between the forward and aft top skins and the stiffeners. Match drilled the aft deck to the frame. Match drilled the side holes between the skin and the longerons. Match drilled the doubler and attachment bar support and the elevator stop. Had to remake the elevator up stop per SB18-03-30