Brendon's RV-10

Fuse May 9 2024

Fuselage Bulkheads Sec 15

With all the parts primed, the fwd bulkhead assembly could be completed. Today was torquing the bolts to 35in-lbs. Riveting still left to complete

Previous post:
Fuse May 8 2024 Fuse May 8 2024

This post is from Brendon's RV-10

Next post:
Fuse May 11 2024 Fuse May 11 2024