Brendon's RV-10

Fuse May 11 2024

Fuselage Bulkheads Sec 15

A bunch of priming today on the rear fwd bulkhead components and riveting all parts for the two fwd spar/bulkheads. Also installed the teflon spacer called out in the plans. Still have the two rear bulkheads left to complete. lots of work, but making great progress!

Previous post:
Fuse May 9 2024 Fuse May 9 2024

This post is from Brendon's RV-10

Next post:
Fuse May 19 2024 Fuse May 19 2024