Brendon's RV-10

Fuse Misc Apr 3 2026

Little Projects

Now that the bulk of the big work has been done, we started working on some of the low hanging fruit that i've been putting off for a while. There was ~20 rivets on the top aft skin that i wasn't able to reach myself, along with the fact that i needed to remove two of the bolts for the seat belt bracket to be able to rivet. Had to squeeze myself in the tailcone to get those out due to access. Also started working on the fuel and brake lines but got frustrated and decided to call it a day early and go out and get some food and relax a little bit.

Previous post:
Step Install Apr 3 2026 Step Install Apr 3 2026

This post is from Brendon's RV-10

Next post:
Fuse Apr 4 2026 Fuse Apr 4 2026