Gary's Sling TSi

12 May 2024

Flap and long elevator torque tubes installation

Lightly sanded the inside of the Vesconite bushings for the flap torque tube and out bushings for the long elevator torque tube. The rotation is beautifully smooth. Riveted the lock bushings in place on the long elevator torque tube. Riveted the 6x control closing ribs into position after installing M4 rivnuts on the aft side of 4 of them having applied Loctite 277.

Previous post:
11 May 2024 11 May 2024

This post is from Gary's Sling TSi

Next post:
13 May 2024 13 May 2024