Gary's Sling TSi

3 & 4 Aug 2024

Minor items wiring antennae connectors and installing rivnuts

Installed BNC and TNC connectors on various antennae cables after applying some heat shrink and labels.

Drilled holes in various floor covers and inspections hatches to larger sizes to suit M4 screws.

Manufactured center console cross members to support cables and hoses.

Installed M4 rivnuts with Loctite 277 on some rear floor / main spar covers.

Drilled hole to accommodate BNC bulkhead connector for an ADSB antenna on the upper rear fuselage top skin in future - catering for the potential requirement for a diversity transponder if it proves to be a requirement at some point.