Gary's Sling TSi

9 - 10 Aug 2024

Sundry preparation and installation

Painted front top skin areas black, will probably need to do another coat once properly cured.

Installed the RG400 cable and bulkhead connector for future use with a top transponder antenna if required for a diversity transponder.

Riveted cable tie cradles to inside rear section of armrest center console area - dimpled the holes first and used shortened 987 (4mm) countersunk rivets to provide a flat exterior surface.

De-riveted the autopilot bellcrank from the short elevator torque tube in preparation for fitment of bearings.

Installed the inner seat rails after countersinking the plastic spacers. Checked the flap torque tube to ensure free movement remained.