Entry: Mon Nov 25 2024
Finished the landing lights assembled, drilled and riveted the brackets. Power wiring later, for now put the light back in the box. Also started deburring a pile of wing hardware.
![Drilled out](https://d3gxvd7rqm4plm.cloudfront.net/john-s/images/6091/entry-mon-nov-25-2024/f2e33da9d8e4420883b2fa17d98af7c3_sm.jpg)
Drilled out
![Installed. Took the light back out to prevent damage.](https://d3gxvd7rqm4plm.cloudfront.net/john-s/images/6091/entry-mon-nov-25-2024/131f640de8b646e0b45a0700c4d1e95d_sm.jpg)
Installed. Took the light back out to prevent damage.