Left Elevator Done
Got the left elevator structure finished. The rolled leading edge all went smoothly, then installed the counterweights and finally the trim tab. I still need to do all the fiberglass tips for all the control surfaces but would like to attend the Sport Air "Fiberglass for RVs" course before tackling that. COVID needs to ease first. The tips can wait. And I need to install the mini-Molex connectors for the trim servo but I want to practice using the crimper and pins first. SO glad to be done with all the control surfaces. Its taken much more time then I thought it would. Moving on to the aft fuselage.....
This post is from Scott's RV-14 Build