Scott's RV-14 Build

Baggage Compartment Floors

Cut and prepped the 6 lengths of hinge line that'll form the adjustable seatback hinges. Then match drilled them to the 2 sections of flooring. Moved on to de-burring. Extensive dimpling and nutplate installation is next.

Previous post:
Flap Bushings Flap Bushings

This post is from Scott's RV-14 Build