Baggage Compartment Floors
Cut and prepped the 6 lengths of hinge line that'll form the adjustable seatback hinges. Then match drilled them to the 2 sections of flooring. Moved on to de-burring. Extensive dimpling and nutplate installation is next.
This post is from Scott's RV-14 Build